Bear Creek Dome Radiant Floor Installation

 
Bear Creek Site Preparation

Bear Creek Site Preparation

Bear Creek Dome Interior

Bear Creek Dome Interior

Bear Creek Dome Exterior

Bear Creek Dome Exterior

Bear Creek Dome Results

Bear Creek Dome Results

 

radiant_floor_installation_bcd010 radiant_floor_installation_bcd009

The 1/2″ Pex tubing is placed on top of the foam and held down with plastic staples.

 

radiant_floor_installation_bcd007 radiant_floor_installation_bcd028

Bending the tubing is made easier by heating up the radius with a heat gun.

 

radiant_floor_installation_bcd011 radiant_floor_installation_bcd026

The basic tubing layout for this project has the tubing spaced 12″ apart. This is a “balanced” system with each different zone being approximately 300′ in tubing length.

 

radiant_floor_installation_bcd029 radiant_floor_installation_bcd030

The dome shape, footings, and unheated cabinet/closet spaces are all factored into the overall plan.

Finished installing Pex tubing late morning.

 

radiant_floor_installation_Bearcreekdome radiant_floor_installation_bearcreek2

radiant_floor_installation_bc3

 

 

 

 

 

 

Bear Creek Site Preparation

Bear Creek Site Preparation

Bear Creek Dome Interior

Bear Creek Dome Interior

Bear Creek Dome Exterior

Bear Creek Dome Exterior

Bear Creek Dome Results

Bear Creek Dome Results

 

nspdomes_banner

 

 

 

Be Sociable, Share!