Bear Creek Dome Cupola Insulation
Fri. — No work was done on the dome yesterday. Electrical wire is being run in the dome shell and 2 ceiling fans are being installed for operation during the construction.
Fri. — Erik and Brett are insulating the view cupola. The foam pieces in between the roof rafters allow for air ventilation on the cold side of the insulation. The cupola roof will have 16″ of insulation in a 18″ space.
Mon. — Work is continuing on the shingling and installing the cupola windows.
Tues. — Installing the Marvin triple pane windows in the cupola openings.
Wed. — Final shingling being done on top of the cupola tomorrow. Interior framing around cupola windows being completed. Temporary insulation installed.